{"id":2166,"date":"2008-01-09T09:51:36","date_gmt":"2008-01-09T09:51:36","guid":{"rendered":"http:\/\/rinf.com\/alt-news\/activism\/how-to-install-micro-wind-turbines-and-solar-panels\/2166\/"},"modified":"2008-01-09T09:51:36","modified_gmt":"2008-01-09T09:51:36","slug":"how-to-install-micro-wind-turbines-and-solar-panels","status":"publish","type":"post","link":"https:\/\/rinf.com\/alt-news\/environmental-news\/how-to-install-micro-wind-turbines-and-solar-panels\/","title":{"rendered":"How To: Install micro wind turbines and solar panels"},"content":{"rendered":"<p class=\"cn_toppara\"><strong>\u00a325 million in grants issued for micro wind turbines and solar panels<\/strong><\/p>\n<p class=\"cn_toppara\">Small scale renewable energy grants worth some \u00a325 million have now been claimed from the Low Carbon Buildings Programme (LCBP). The news came as Energy Minister Malcolm Wicks called for more homes and business to follow his lead by adopting a \u2018go green\u2019 new year\u2019s resolution.<\/p>\n<p class=\"cn_arttext\"><font size=\"2\">His call comes as more and more homes, schools and businesses have been helped with Government grants to install technologies such as solar panels, biomass boilers and ground-source heat pumps.<\/p>\n<p>Grants claimed under BERR\u2019s Low Carbon Buildings Programme since it launched in April 2006 are up to approximately \u00a325 million:<\/p>\n<p>* \u00a37.5 million to help 4,600 households generate their own clean and green energy.<\/p>\n<p>* \u00a318 million for a total of 739 projects on school, community, housing association and business buildings.<\/p>\n<p>Energy Minister Malcolm Wicks said: &#8220;It\u2019s vital that recent efforts by world governments to reach a deal on cutting global carbon emissions are matched by action by each and every one of us. Deciding to go green and generate your own clean energy is one of the most valuable New Year\u2019s resolutions you can make. It is certainly my intention to make a difference, and make my own house more energy efficient and install clean and green electricity.<\/p>\n<p>&#8220;There are still grants available to householders who want to follow in the footsteps of the thousands across the UK who have been helped by the Government to fit microgeneration technology at their homes. Many schools have benefited also and the pupils there have been able to see renewable energy in action and understand more about its important benefits.&#8221;<\/p>\n<p>There are still \u00a311m in grants available under Phase 1 for householders who want to generate renewable energy at home. Schools, charitable bodies and other public sector organisations can apply for a share of the \u00a344m that remains from the original \u00a350m set aside for them under Phase 2.<\/p>\n<p>It has also been another year of progress for the wider renewable sector.<\/p>\n<p>* Consent for eight major renewables projects, including the world\u2019s largest biomass plant in Port Talbot; the innovative Wave Hub project off the Cornish coast; the 66MW Fullabrook Down wind farm in Devon and a 450MW offshore wind farm at Walney in the Irish Sea.<\/p>\n<p>* Announcement by Energy Secretary John Hutton of plans for a massive expansion in offshore wind power. The vast bulk of the seas around the UK are to be covered by a new Strategic Environmental Assessment, opening up the possibility of enough offshore wind to power all of the UK\u2019s homes.<\/p>\n<p>* The announcement by John Hutton of a feasibility study into the possibility of clean energy generation in the Severn Barrage that could generate up to 5% of the UK\u2019s future electricity.<\/p>\n<p>In 2008 the momentum will be maintained with the introduction of legislation that will aim to \u2018band\u2019 the Renewables Obligation to bring on more support for less developed renewables technologies such as wave, tidal and offshore wind.<\/p>\n<p><strong>Background<\/strong><\/p>\n<p>For more information on the Low Carbon Buildings Programme and to apply for grants click here: <a href=\"http:\/\/www.lowcarbonbui%20ldings.org.uk\/about\/hfaqs\/\">http:\/\/www.lowcarbonbuildings.org.uk\/about\/hfaqs\/\u00a0<\/a> <\/font><font size=\"2\"><\/p>\n<p><strong>Some successful applicant case studies:<br \/>\n<\/strong><br \/>\n<strong>Christ Church Chislehurst, Kent<\/strong><\/p>\n<p>Michael Milton Church Warden.<\/p>\n<p><a href=\"http:\/\/www.chislehurst-christchurch.diocese-rochester.org\/\">http:\/\/www.chislehurst-christchurch.diocese-rochester.org<\/a><\/font><\/p>\n<p><font size=\"2\"><br \/>\nGrant \u00a310k of \u00a351k system cost<\/p>\n<p>6 boreholes; 34kw ground source heat pump system<\/p>\n<p>The ground source heat pumps will heat the new community building which will be linked to both the church and the refurbished church hall. The church grounds were used for the installation of boreholes and the the new extension incorporated underfloor heating. With the availability of a grant to partially fund the installation, this form of technology also offers a realistic payback period, which off-sets the need to raise additional funds by private individual donations.<\/p>\n<p><strong>Bute Cottage Nursery School, Penarth<\/strong>.<\/p>\n<p>Cery Hoffrock, Headteacher<\/p>\n<p><a href=\"mailto:butecottns@valeofglamorgan.gov.uk\">butecottns@valeofglamorgan.gov.uk<\/a><\/p>\n<p>\u00a31.7k of \u00a33.5k system cost<\/p>\n<p>Education of 3 to 5 year olds, community learning for a catchment that includes the whole of Penarth. 80 children are on roll and these children are replaced by 80 new ones each year. The nursery school is committed to conservation &amp; recycling and engages &amp; educates the wider community in joining with it to ensure that it continues to be recognised as an International Green Flag Eco-School.<\/p>\n<p><strong>Runshaw College, Leyland, Lancs<\/strong><\/p>\n<p>Grant \u00a327k of \u00a354k system cost<\/p>\n<p>11kWp Solar PV system<\/p>\n<p>Further education college, electricity for sports hall, fitness suite, indoor and outdoor changing facilities. Analysis ruled out wind power. The visual presence of Solar PV coupled with the active system monitoring from an educational point of view, the long life of the technology and the opportunity to claim renewable obligation certificates and rewards for any export payments all underlined Solar PV as the right choice.<\/p>\n<p><strong>Fulston Manor School, Kent<br \/>\n<\/strong><br \/>\nClive Johnson, Headmaster<\/p>\n<p><a href=\"http:\/\/www.solar4schools.co.uk\/schools\/fulston_manor_school.html\">http:\/\/www.solar4schools.co.uk\/schools\/fulston_manor_school.html<\/a><\/p>\n<p>Grant \u00a310k of \u00a320k system cost<\/p>\n<p>4kWp Solar PV system<\/p>\n<p><strong>Tia Greyhound and Lurcher Rescue, Halifax, Yorks<\/strong><\/p>\n<p>Jean Burchell<\/p>\n<p><a href=\"http:\/\/www.tiagreyhounds.org.uk\/\">http:\/\/www.tiagreyhounds.org.uk\/<\/a><\/p>\n<p>6kW Proven Wind Turbine<\/p>\n<p>Grant \u00a310k of \u00a321k system cost<\/p>\n<p>As the Charity\u2019s name suggests the objects are to provide refuge and veterinary care for dogs in need &#8211; in particular Greyhounds and Lurchers. The wind turbine will power the farmhouse which is the charity\u2019s headquarters incorporating living accommodation for the on-site Trustee, office space and housing for older\/sick dogs as well as the kennel block housing in the region of 80 dogs at any one time.<\/p>\n<p><a target=\"_blank\" href=\"http:\/\/www.cambridgenetwork.co.uk\/news\/article\/default.aspx?objid=42460\">Source<\/a><\/p>\n<p><font size=\"2\" face=\"Arial\">If you have a question that&#8217;s not listed below you can post a new one on the Energy Saving Trust&#8217;s frequently asked questions database, <a target=\"_blank\" href=\"http:\/\/est.custhelp.com\/cgi-bin\/est.cfg\/php\/enduser\/std_alp.php?p_sid=yxiDDqci&amp;p_lva=&amp;p_li=&amp;p_accessibility=0&amp;p_page=1&amp;p_cv=&amp;p_pv=1.30&amp;p_prods=30&amp;p_cats=+&amp;p_hidden_prods=&amp;prod_lvl1=30&amp;cat_lvl1=+&amp;p_search_text=low+carbon+buildings&amp;p_new_search=1\">click here to go to this database<\/a>.<\/font><\/p>\n<p><font size=\"2\" face=\"Arial\"><strong>A.) What levels of grants will be available?<\/strong><br \/>\nThe current grant levels are as follows and we will regularly review them as the market for each technology develops:<\/font><\/p>\n<table border=\"1\" width=\"437\" cellPadding=\"1\" cellSpacing=\"1\" style=\"width: 437px; height: 223px\">\n<tr>\n<td><font size=\"2\" face=\"Arial\"><strong>\u00a0Technology<\/strong><\/font><\/td>\n<td><font size=\"2\" face=\"Arial\"><strong>\u00a0Maximum Amount of Grant<\/strong><\/font><\/td>\n<\/tr>\n<tr>\n<td><font size=\"2\" face=\"Arial\">\u00a0Solar photovoltaics<\/font><\/td>\n<td><font size=\"2\" face=\"Arial\">Maximum of \u00a32,000 per kW of installed capacity, subject to an overall maximum of \u00a32,500 <strong>or<\/strong> 50% of the relevant eligible costs, whichever is the lower<\/font><\/td>\n<\/tr>\n<tr>\n<td><font size=\"2\" face=\"Arial\">\u00a0Wind turbines<\/font><\/td>\n<td><font size=\"2\" face=\"Arial\">Maximum of \u00a31,000 per kW of installed capacity, subject to an overall maximum of \u00a32,500 <strong>or<\/strong> 30% of the relevant eligible costs, whichever is the lower<\/font><\/td>\n<\/tr>\n<tr>\n<td><font size=\"2\" face=\"Arial\">\u00a0Small hydro<\/font><\/td>\n<td><font size=\"2\" face=\"Arial\">Maximum of \u00a31,000 per kW of installed capacity, subject to an overall maximum of \u00a32,500 <strong>or<\/strong> 30% of the relevant eligible costs, whichever is the lower<\/font><\/td>\n<\/tr>\n<tr>\n<td><font size=\"2\" face=\"Arial\">Solar thermal hot water<\/font><\/td>\n<td><font size=\"2\" face=\"Arial\">Overall maximum of \u00a3400 <strong>or<\/strong> 30% of the relevant eligible costs, whichever is the lower<\/font><\/td>\n<\/tr>\n<tr>\n<td><font size=\"2\" face=\"Arial\">Ground source heat pumps<\/font><\/td>\n<td><font size=\"2\" face=\"Arial\">Overall maximum of \u00a31,200 <strong>or<\/strong> 30% of the relevant eligible costs, whichever is the lower<\/font><\/td>\n<\/tr>\n<tr>\n<td><font size=\"2\" face=\"Arial\">Automated wood pellet fed room heaters\/stoves<\/font><\/td>\n<td><font size=\"2\" face=\"Arial\">Overall maximum of \u00a3600 <strong>or<\/strong> 20% of the relevant eligible costs, whichever is the lower<\/font><\/td>\n<\/tr>\n<tr>\n<td><font size=\"2\" face=\"Arial\">Wood fuelled boiler systems<\/font><\/td>\n<td><font size=\"2\" face=\"Arial\">Overall maximum of \u00a31,500 <strong>or<\/strong> 30% of the relevant eligible costs, whichever is the lower<\/font><\/td>\n<\/tr>\n<\/table>\n<p><font size=\"2\" face=\"Arial\"><strong>B.) Who can apply for a grant?<\/strong><br \/>\nIndividual property owners including private householders can apply for grants from the programme. <\/font><br \/>\n<font size=\"2\" face=\"Arial\"><strong>C.) How will the application process work?<\/strong><br \/>\nApplications are accepted on a rolling first-come-first-served basis. <\/font><font size=\"2\" face=\"Arial\">An outline of the process is as follows:<\/font><\/p>\n<p><font size=\"2\" face=\"Arial\"><\/p>\n<ol>\n<li>Complete the energy efficiency measures required by the programme, obtain planning permission for your installation if necessary and obtain a quote from an accredited installer.\u00a0<\/li>\n<li>Make an application online.\u00a0<\/li>\n<li>After receiving a grant offer letter via email, order the equipment and begin installing the technology. The grant validity period varies by technology. See D.) below for more details.<\/li>\n<li>After you have completed the installation and you have paid the installer, you can submit the claim documents to the Energy Saving Trust.<\/li>\n<li>The grant claim is checked and, if in order, the grant will be issued within 25 working days of receipt of all the documentation.<\/li>\n<\/ol>\n<p><\/font><font size=\"2\" face=\"Arial\">Applications can be received from properties located within England, Wales, Northern Ireland or Scotland (excluding the Isle of Man and the Channel Islands).<\/font><\/p>\n<p><font size=\"2\" face=\"Arial\">Please note: you should wait until you have received a grant offer letter before commencing the installation.<br \/>\n<\/font><\/p>\n<p><font size=\"2\" face=\"Arial\"><strong>D.) How long will my grant be valid for?<br \/>\n<\/strong>Grant validity periods vary by technology. <\/font><\/p>\n<p><font size=\"2\" face=\"Arial\">Installations on existing buildings:<br \/>\n<\/font><\/p>\n<ul>\n<li><font size=\"2\" face=\"Arial\">Solar Thermal Hot Water \u2014 3 months<\/font><\/li>\n<li><font size=\"2\" face=\"Arial\">Solar PV \u2014 4 months<\/font><\/li>\n<li><font size=\"2\" face=\"Arial\">Wind Turbines \u2014 4 months<\/font><\/li>\n<li><font size=\"2\" face=\"Arial\">Ground Source Heat Pumps \u2014 6 months<\/font><\/li>\n<li><font size=\"2\" face=\"Arial\">Wood Fuelled Boilers \u2014 6 months<\/font><\/li>\n<li><font size=\"2\" face=\"Arial\">Pellet Stoves \u2014 6 months<\/font><\/li>\n<li><font size=\"2\" face=\"Arial\">Small Scale Hydro \u2014 12 months<\/font><\/li>\n<\/ul>\n<p><font size=\"2\" face=\"Arial\">Installations on buildings under construction:<br \/>\n<\/font><\/p>\n<ul>\n<li><font size=\"2\" face=\"Arial\">Solar Thermal Hot Water \u2014 6 months<\/font><\/li>\n<li><font size=\"2\" face=\"Arial\">Solar PV \u2014 6 months<\/font><\/li>\n<li><font size=\"2\" face=\"Arial\">Wind Turbines \u2014 6 months<\/font><\/li>\n<li><font size=\"2\" face=\"Arial\">Ground Source Heat Pumps \u2014 6 months<\/font><\/li>\n<li><font size=\"2\" face=\"Arial\">Wood Fuelled Boilers \u2014 6 months<\/font><\/li>\n<li><font size=\"2\" face=\"Arial\">Pellet Stoves \u2014 6 months<\/font><\/li>\n<li><font size=\"2\" face=\"Arial\">Small Scale Hydro \u2014 12 months<\/font><\/li>\n<\/ul>\n<p><font size=\"2\" face=\"Arial\"><strong>E.) How long will it take to receive my grant payment?<\/strong><br \/>\nWe aim to process grant claims within 25 working days of receipt of full claim documents. Currently our grant processing time is\u00a022\u00a0working days as of\u00a07th January 2008. <\/font><\/p>\n<p><font size=\"2\" face=\"Arial\"><strong>F.) Is there any guidance available for the online application system?<br \/>\n<\/strong>Yes, please read the following guidance notes<br \/>\n<\/font><\/p>\n<p><font size=\"2\" face=\"Arial\"><strong>G.) What are the required energy efficiency measures?<\/strong><br \/>\nYou must undertake a number of energy efficiency measures before you are eligible to apply for a grant from the Low Carbon Buildings Programme. These measures will ensure that you are minimising your energy requirements. Before applying we require you to have: <\/font><\/p>\n<p><font size=\"2\" face=\"Arial\">a. insulated the whole of the loft of the property to meet current building regulations e.g. 270mm of mineral wool loft insulation or suitable alternative<br \/>\nb. installed cavity wall insulation (if you have cavity walls)<br \/>\nc. fitted low energy light bulbs in all appropriate light fittings<br \/>\nd. installed basic controls for your heating system to include a room thermostat and a programmer or timer.<\/font><\/p>\n<p><font size=\"2\" face=\"Arial\">We recommend that you complete a <a target=\"_blank\" href=\"http:\/\/www.energysavingtrust.org.uk\/proxy\/view\/full\/165\/homeenergycheck\">home energy check<\/a> to assess which measures are most suitable for your home. You can also call your local Energy Saving Trust advice centre on 0800 512 012 for guidance on energy efficiency measures and energy efficiency grants available in your area.<\/font><br \/>\n<font size=\"2\" face=\"Arial\"><strong>H.) I applied for a householder grant online and was successful. Why haven\u2019t I received my email confirmation?<br \/>\n<\/strong>When you successfully apply for a householder grant online you will receive a grant offer letter via email. Therefore you must enter your email address accurately. If your email account has a spam filter your grant offer letter may be sent to your junk items box. If you have not received your grant offer letter within 3 working days and it is not in your junk items box please call our helpline on 0800 915 0990.<br \/>\n<\/font><\/p>\n<p><font size=\"2\" face=\"Arial\"><strong>I.) I applied for a grant with a paper application. Why haven\u2019t I received any response?<\/strong><br \/>\nPaper application forms will be processed within 15 working days of receipt. If you have given an email address on your application form and ticked to say you are happy to receive communications by email, any response to your application will be sent to that email address. If you do not have an email address a response will be sent by post to the correspondence address listed on your application form.<br \/>\n\u00a0<br \/>\n<strong>J.) Where can my installer obtain a completion certificate?<\/strong><br \/>\nThese can be downloaded from this website, <a target=\"_blank\" href=\"http:\/\/www.est.org.uk\/download.cfm?p=11&amp;pid=961\">click here to download the completion certificates<\/a>. <\/font><\/p>\n<p><font size=\"2\" face=\"Arial\"><strong>K.)\u00a0Provisional certification<br \/>\n<\/strong>Installers certified under the Low Carbon Buildings Programme can be either provisionally or fully certified. Provisional certification means that a certified installer can carry out 5 installations; the installer must be inspected by the certification organisation before they can become fully\u00a0certified and do an unlimited number of installations.<\/font><\/p>\n<p><font size=\"2\" face=\"Arial\">Both provisionally and fully\u00a0certified installers are available for selection on the online application system. However, please note that once the provisionally certified\u00a0installer you have selected has reached the 5 installation limit, the online system will not allow you to proceed with an application. You will only be able to select them again once they have become fully certified; the same rules apply for applications made on paper.<br \/>\n<\/font><\/p>\n<p><font size=\"2\" face=\"Arial\"><strong>L.) What are the criteria for receiving a grant?<br \/>\n<\/strong>The main criteria for householders are:<br \/>\n1.\u00a0Applicants must be the householder \/ owners of the property for which the grant is applied (applicants who have leasehold ownership must have permission of the property freeholder).<br \/>\n2.\u00a0Applicants must be resident of, and the installation address be situated in England, Scotland, Wales or Northern Ireland (excluding the Isle of Man and the Channel Islands).<br \/>\n3.\u00a0Systems must supply a permanent building (mobile homes, caravans, house boats etc. are not eligible).<br \/>\n4.\u00a0You have installed the basic level of energy efficiency measures as outlined in FAQ G above. You may be able to access grants for energy efficiency measures. Have a look at the Energy Saving Trust&#8217;s grants information database or call your local Energy Saving Trust advice centre on 0800 512 012 for information on energy efficiency grants .<br \/>\n5.\u00a0You must have received planning permission for your installation or received confirmation from your local authority that it is not required.\u00a0\u00a0 <\/font><\/p>\n<p><font size=\"2\" face=\"Arial\"><strong>M.) <\/strong><font size=\"2\"><strong>Can I still receive a grant if a non-certified installer performs the installation?<br \/>\n<\/strong>Only if the\u00a0certified installer who installed the technology was not contracted to you directly, but was sub-contracted by your main contractor. In this case, the\u00a0certified installer must fill out the completion certificate, and you must provide a suitable chain of copy invoices evidencing to the Energy Saving Trust&#8217;s satisfaction that the work was carried out by the\u00a0certified installer and that the\u00a0certified installer has been paid in full for that work. <\/font><\/font><\/p>\n<p><font size=\"2\" face=\"Arial\"><strong>N.) I live in a house owned by the council; can I apply for a grant?<\/strong><br \/>\n<\/font><span style=\"font-size: 10pt\"><font face=\"Arial\">Unfortunately you can\u2019t apply for a grant. The council &#8211; as the owner of the building &#8211; must apply for the grant under the Phase 1, Stream 2 or Phase 2 of the Low Carbon Buildings Programme.<\/p>\n<p><strong>O.) I would like to install a microgeneration technology on my property, but I rent part of it out. Will I be eligible for a grant?<br \/>\n<\/strong>It depends. In order to be eligible for a grant, the benefit of the system must be clearly accrued<em> only<\/em> to the domestic owner and resident.\u00a0For example: you would like to install photovoltaic tiles on the ground floor extension of a property you own but let out the top floor. In this case, you will be eligible for a grant as long as you use the ground floor flat as a dwelling, and the electricity generated by the installation only benefits that flat (through separate metering).<\/p>\n<p><strong>P.) Can I apply more than once for the same project for different technologies?<\/strong><br \/>\nYes you can. You can apply for funding for up to 3 different technologies on one building, with a maximum of 3 different buildings funded (NB these have to be on separate applications). There is a maximum of \u00a32,500 of funding available per installation address.<\/p>\n<p><strong>Q.) What if the grant applications are for different addresses?<\/strong><br \/>\nDifferent addresses are still eligible as the programme is all about maximising the number of low carbon buildings.<\/p>\n<p><strong>R.) I received a grant under the old schemes (Clear Skies and PV schemes), can I have a grant from the Low Carbon Buildings Programme too?<br \/>\n<\/strong><\/font><\/span><span style=\"font-size: 10pt\"><font face=\"Arial\">Yes, provided it is for another technology. You cannot have more than one grant from this or the previous programmes for the same technology.<\/p>\n<p><strong>S.) I live in Scotland \/ Northern Ireland, can I also get a grant from the schemes operating here?<br \/>\n<\/strong><\/font><font face=\"Arial\"><span style=\"color: #333333\">You will not be allowed to receive a grant from the Low Carbon Buildings Programme along with a grant from the Scottish Community and Household Renewables Initiative (SCHRI) or the\u00a0Northern Ireland&#8217;s Renewable Energy Fund\u00a0for the same project or installation; i.e. double funding for projects will not be allowed.<\/p>\n<p><strong>T<\/strong><\/span><strong>.) Can I obtain lottery funding in addition to the Low Carbon Buildings Programme Grant?<br \/>\n<\/strong>Yes, you will be able to apply for funding under the Low Carbon Buildings Programme as well as for lottery funding, provided the total sum of funding received does not exceed 100% of the cost of the installation.<\/p>\n<p><strong>U.) What can be funded?<br \/>\n<\/strong>Grants are available for more than one microgeneration technology at the same address.\u00a0All new systems supported with Low Carbon Buildings Grants must deliver an output of greater than 0.5kWp for electrical installations. There is no minimum for thermal installations.<\/p>\n<p>Applications must be related to installations on permanent buildings. Applications for temporary and mobile buildings or non-building related installations will not be considered for Grant support (e.g. mobile homes, houseboats, motorway sound barriers, telecommunication towers).<\/font><\/span><\/p>\n<p style=\"margin: 0cm 0cm 6pt\"><span style=\"font-size: 10pt\"><font face=\"Arial\">Grants will only be awarded in respect of equipment and work directly related to the installed system. This includes design of the system, the cost of the plant and\/or materials, installation and connection. Unrelated building works are not eligible.<\/font><\/span><\/p>\n<p style=\"margin: 0cm 0cm 6pt\"><span style=\"font-size: 10pt\"><font face=\"Arial\">Grants may only be claimed for approved (certified) products\/systems. Your\u00a0certified installer will be aware of this list.\u00a0Where you have applied for a grant and installed a product not listed on the approved register, your grant will NOT be paid.\u00a0<\/font><\/span><\/p>\n<p style=\"margin: 0cm 0cm 6pt\"><span style=\"font-size: 10pt\"><font face=\"Arial\">Installations should be designed and commissioned by\u00a0certified installers. If a non-certified installer carries out the installation, then the grant will not be awarded in respect of this part of the cost. A certified\u00a0installer must confirm that the system has been satisfactorily installed by signing the programme completion certific. <\/font><\/span><\/p>\n<p style=\"margin: 0cm 0cm 6pt\"><span style=\"font-size: 10pt\"><\/span><\/p>\n<p style=\"margin: 0cm 0cm 6pt\"><span><font size=\"2\" face=\"Arial\">Please note the grant will not cover:<\/font><\/span><\/p>\n<ul>\n<li>\n<p style=\"margin: 0cm 0cm 6pt\"><font size=\"2\" face=\"Arial\">Value Added Tax (VAT) <\/font><\/p>\n<\/li>\n<li>\n<p style=\"margin: 0cm 0cm 6pt\"><font size=\"2\" face=\"Arial\">Un-associated costs (e.g. roofing works outside the direct installation of the microtechnology system, vandal covers, asbestos removal, upgrades to your household ring main, new radiators or heat distribution system, etc.) <\/font><\/p>\n<\/li>\n<li>\n<p style=\"margin: 0cm 0cm 6pt\"><font size=\"2\" face=\"Arial\">Warranty costs \u2014 all accredited microgeneration installers are required to provide an installation warranty free of charge. Manufacturers usually provide an extensive lifetime warranty for their technology. Consult your installer for details of these warranties before committing <\/font><\/p>\n<\/li>\n<li>\n<p style=\"margin: 0cm 0cm 6pt\"><font size=\"2\" face=\"Arial\">Expenditure on works or activities which any other person or organisation has a statutory duty to undertake <\/font><\/p>\n<\/li>\n<li>\n<p style=\"margin: 0cm 0cm 6pt\"><font size=\"2\" face=\"Arial\">Any liability arising out of negligence on the part of the Applicant or its representatives <\/font><\/p>\n<\/li>\n<li>\n<p style=\"margin: 0cm 0cm 6pt\"><font size=\"2\" face=\"Arial\">Expenditure of a political or religious nature <\/font><\/p>\n<\/li>\n<\/ul>\n<p><font size=\"2\"><font face=\"Arial\">Please refer to the term and conditions\u00a0for further details.<br \/>\n<\/font><br \/>\n<\/font><font size=\"2\" face=\"Arial\"><strong>V.) Can I pay a deposit before I apply for my grant?<\/strong><br \/>\nPlease note that any payment you make to your installer is done at your own risk. Grant assistance is not automatically guaranteed to all who make an application; we therefore advise applicants not to make any payments before the receipt of a grant offer.<\/font><\/p>\n<p><font size=\"2\" face=\"Arial\"><strong>W.) My grant offer letter now contains out of date information due to changes to my installation project; what can I do?<br \/>\n<\/strong>If your grant offer letter becomes out of date due to changes to your installation project, you must, as a condition of the grant, inform us in writing of these changes. You may <\/font><\/p>\n<p><font size=\"2\" face=\"Arial\">EITHER <\/font><\/p>\n<p><font size=\"2\" face=\"Arial\">Withdraw from your current grant offer and reapply with details from your newly appointed installer. In this instance your grant offer would be re-issued with the correct details listed. <\/font><\/p>\n<p><font size=\"2\" face=\"Arial\">OR<\/font><\/p>\n<p><font size=\"2\" face=\"Arial\">Continue installation work at your own risk under your current grant offer. In this instance, your grant offer and web entry will not be updated with the details you have supplied. We will accept a grant claim against your original grant offer though please note that:<br \/>\n1) the maximum grant payable will be capped at your original offer amount but may be reduced<br \/>\n2) the grant claim will only be honoured where:<br \/>\n&#8211; All information complies with the terms and conditions of the grant<br \/>\n&#8211; The new installer has the correct\u00a0certification<br \/>\n&#8211; The equipment installed is approved<br \/>\nIf when you come to claim, there is a problem with your installer&#8217;s\u00a0certification, or they have installed unapproved equipment then we will reject your claim and no monies will be payable. <\/font><a href=\"http:\/\/www.lowcarbonbuildings.org.uk\/info\/installers\/\"><font size=\"2\" face=\"Arial\">Please click here to check\u00a0certification status of your proposed system and new installer<\/font><\/a><font size=\"2\" face=\"Arial\">.<br \/>\n<\/font><\/p>\n<p><font size=\"2\" face=\"Arial\"><strong>X.) Which technology is right for me?<br \/>\n<\/strong>It depends on the location of your house and the type of microgeneration system that you are considering on installing. You could take a look at the section on this website on microgeneration technologies to consider the technology that might be most suitable for you. <\/font><\/p>\n<p><font size=\"2\" face=\"Arial\">If you would like to read about other case studies of previously funded microgeneration installations take a look at:\u00a0<\/p>\n<p>The Clear Skies website and the Energy Saving Trust&#8217;s website.<br \/>\n\u00a0<br \/>\n<strong>Y.) Can grants be obtained for Air Source Heat Pumps?<br \/>\n<\/strong>The current accreditation schemes does not cover this technology. The new scheme will do so after appropriate standards for this technology have been developed.\u00a0 <\/font><\/p>\n<p><font size=\"2\" face=\"Arial\"><strong>Z.) Are wind turbines suitable in all locations?<br \/>\n<\/strong>The Energy Saving Trust does not guarantee or underwrite the performance of any technology grant funded under the Low Carbon Buildings Programme. You are advised to ask your installer (or the product manufacturer) what reassurances they can provide you in support of any performance claims they make. <\/font><\/p>\n<p><font size=\"2\" face=\"Arial\">This is especially important for small wind turbines, due to the variability in local wind conditions. For some newer wind turbines, particularly those designed for mounting on buildings, there may not be (or only limited) independent long-term performance data verifying performance claims.<\/font><\/p>\n<p><font size=\"2\" face=\"Arial\"><strong>AA.) How long must the microgeneration system operate?<\/strong><br \/>\nThe system installed must operate at the Installation address for a minimum of 5 years from the date of the completion certificate. The Energy Saving Trust, or its authorised representative, may carry out a site inspection to ensure compliance of these programme conditions. Applicants must also ensure that end users of the microgeneration system co-operate with any energy monitoring exercise carried out by the Energy Saving Trust or its authorised representatives. <\/font><\/p>\n<p><font size=\"2\" face=\"Arial\"><strong>AB.) What if I decide to sell my property before the 5 years are up?<\/strong><br \/>\nYou must then write to the Low Carbon Buildings Programme to inform us of this as well as of the details of the person(s) that have bought the property. The new owner(s) must be made aware that the terms and conditions of grant have now passed on to them.<\/font><\/p>\n<p><font size=\"2\" face=\"Arial\"><strong>AC.) I can&#8217;t find an installer for Fuel Cells, Renewable CHP or Micro CHP?<br \/>\n<\/strong>The new certification scheme will cover these technologies after appropriate standards for these technologies have been developed.\u00a0<\/font><\/p>\n<p><font size=\"2\" face=\"Arial\"><strong>AD.) I would like to use a particular installer that is not on the list, what can I do?<br \/>\n<\/strong>The onus for obtaining\u00a0certification for the installation of renewable energy technologies lies with the installer and not with the\u00a0certification organisation. If an installer wishes to become certified, and so be able to service customers who are also looking to apply for a grant under the Low Carbon Buildings Programme, they will need to join the UK Microgeneration Certification Scheme <\/font><a href=\"http:\/\/www.uk-microgeneration.co.uk\/\"><font size=\"2\" face=\"Arial\">www.uk-microgeneration.co.uk<\/font><\/a><font size=\"2\" face=\"Arial\">. <\/font><\/p>\n<p><font size=\"2\" face=\"Arial\"><strong>AE.) How many grants have been given so far?<\/strong><br \/>\n<\/font><a target=\"_blank\" href=\"http:\/\/www.lowcarbonbuildings.org.uk\/lcbp\/statistics\/statisticsView.action;jsessionid=0a0a071930d6cf73d95b1a674a388fd6ab873a440868.e34PbhyQbxyKbO0Ma3mQb34PbNuKe6fznA5Pp7ftolbGmkTy\"><font size=\"2\" face=\"Arial\">By clicking here you can view statistics on stream 1 &#8211; household grant applications by country and region<\/font><\/a><font size=\"2\" face=\"Arial\">.<\/font><\/p>\n<p><font face=\"Arial\"><a target=\"_blank\" href=\"http:\/\/www.lowcarbonbuildings.org.uk\/about\/hfaqs\/\">Source<\/a><\/font><\/p>\n<p><\/font><\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u00a325 million in grants issued for micro wind turbines and solar panels Small scale renewable energy grants worth some \u00a325 million have now been claimed from the Low Carbon Buildings Programme (LCBP). The news came as Energy Minister Malcolm Wicks called for more homes and business to follow his lead by adopting a \u2018go green\u2019 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,20,18],"tags":[74],"class_list":{"0":"post-2166","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-environmental-news","7":"category-general","8":"category-latest-news","9":"tag-climate-change"},"_links":{"self":[{"href":"https:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/posts\/2166","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/comments?post=2166"}],"version-history":[{"count":0,"href":"https:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/posts\/2166\/revisions"}],"wp:attachment":[{"href":"https:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/media?parent=2166"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/categories?post=2166"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/tags?post=2166"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}