{"id":308151,"date":"2017-05-14T16:55:21","date_gmt":"2017-05-14T15:55:21","guid":{"rendered":"http:\/\/rinf.com\/alt-news\/newswire\/boeings-new-737-grounded-over-flaw-in-engine-component\/"},"modified":"2017-05-14T16:55:21","modified_gmt":"2017-05-14T15:55:21","slug":"boeings-new-737-grounded-over-flaw-in-engine-component","status":"publish","type":"post","link":"http:\/\/rinf.com\/alt-news\/newswire\/boeings-new-737-grounded-over-flaw-in-engine-component\/","title":{"rendered":"Boeing\u2019s new 737 grounded over flaw in engine component"},"content":{"rendered":"<p><img decoding=\"async\" src=\"https:\/\/cdn.rt.com\/files\/2017.05\/thumbnail\/5914ae82c46188cd6e8b4648.jpg\" \/><\/p>\n<div>\n<p><time class=\"date date_article-header\">Published time: 11 May, 2017 19:38 <\/time><time class=\"date date_article-header\">Edited time: 12 May, 2017 09:27 <\/time><\/p>\n<p>        All test flights of Boeing\u2019s 737 MAX have been put on hold, pending a review of a flaw in an engine component. The aircraft is still on schedule for its first deliveries later this month the company said, as its shares slipped on the announcement.<\/p>\n<div class=\"article__text text  js-mediator-article\">\n<p>Boeing grounded the fleet of about 20 airplanes after CFM International, which makes the 737 MAX\u2019s Leap-1B jet engine, discovered a defect in one engine part. CFM is a joint venture between General Electric (GE) and France\u2019s Safran.<\/p>\n<p>An inspection last week discovered a defect in the large metal disc used in the low-pressure turbine at the rear of the engine, Reuters reported, citing CFM spokesman Jamie Jewell.<\/p>\n<p><em>\u201cThere have been no issues whatsoever with engines in the field,\u201d<\/em> Jewell said.<\/p>\n<p>GE spokesman Rick Kennedy confirmed that the flawed disc had not been installed in an engine.<\/p>\n<p>The approximately 40 engines that have been built so far will be sent back to factories in Lafayette, Indiana or Villaroche, France for inspection, Kennedy said. Many will need to be removed from aircraft first, said Jewell.<\/p>\n<p>The 737 MAX is Boeing\u2019s fastest-selling plane, with over 3,700 preorders. The first deliveries were scheduled for later this month to Malaysia\u2019s Malindo Air. US-based Southwest and American Airlines have ordered 200 and 100 of the jets, respectively.<\/p>\n<p>Boeing and CFM said they remained committed to meeting the delivery date while maintaining the production of the jet with no changes.<\/p>\n<p><em>\u201cWe still plan to start deliveries this month. But there is no official date set yet. We\u2019re keeping all of our customers updated on the progress,\u201d<\/em> said Boeing spokesman Doug Alder.<\/p>\n<p><em>\u201cThis doesn\u2019t look like a serious concern,\u201d<\/em> Cai von Rumohr, an analyst with financial services firm Cowen &amp; Co, wrote to his clients, according to Canada\u2019s <a href=\"http:\/\/news.nationalpost.com\/news\/world\/on-cusp-of-debut-boeing-grounds-737-max-jetliner-after-potential-manufacturing-flaw-in-engine\">National Post<\/a>. The engine problem is <em>\u201cnot a design shortfall but what appears to be an easily fixable sub-tier supplier component issue.\u201d<\/em><\/p>\n<p>The 737 MAX 8 seats 162 passengers in a typical configuration and has a list price of $110 million, Reuters reported.<\/p>\n<p>According to <a href=\"https:\/\/airwaysmag.com\/industry\/boeing-ground-737-max-fleet-engine-inspections\/\">Airways<\/a> magazine, Norwegian Air Shuttle has plans to use the new jet for transatlantic service to the US from the UK and Ireland, starting in June.<\/p>\n<\/div>\n<\/div>\n<p>Via <a href=\"https:\/\/www.rt.com\/usa\/388030-boeing-737-grounded-engine-flaw\/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=RSS\">RT<\/a>. This piece was reprinted by <a href=\"http:\/\/rinf.com\">RINF Alternative News<\/a> with permission or license.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Published time: 11 May, 2017 19:38 Edited time: 12 May, 2017 09:27 All test flights of Boeing\u2019s 737 MAX have been put on hold, pending a review of a flaw in an engine component. The aircraft is still on schedule for its first deliveries later this month the company said, as its shares slipped on [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":308152,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[519],"tags":[],"class_list":{"0":"post-308151","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-newswire"},"_links":{"self":[{"href":"http:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/posts\/308151","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/comments?post=308151"}],"version-history":[{"count":0,"href":"http:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/posts\/308151\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/media\/308152"}],"wp:attachment":[{"href":"http:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/media?parent=308151"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/categories?post=308151"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/tags?post=308151"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}