{"id":275774,"date":"2016-10-26T21:43:29","date_gmt":"2016-10-26T20:43:29","guid":{"rendered":"http:\/\/rinf.com\/alt-news\/newswire\/failed-weapons-systems-cost-pentagon-58-billion-over-two-decades\/"},"modified":"2016-10-26T21:43:29","modified_gmt":"2016-10-26T20:43:29","slug":"failed-weapons-systems-cost-pentagon-58-billion-over-two-decades","status":"publish","type":"post","link":"http:\/\/rinf.com\/alt-news\/newswire\/failed-weapons-systems-cost-pentagon-58-billion-over-two-decades\/","title":{"rendered":"Failed weapons systems cost Pentagon $58 billion over two decades"},"content":{"rendered":"<p>        The Pentagon loves to throw good money after bad \u2012 to the tune of nearly $60 billion on failed big-ticket weapons systems over the last two decades, according to a new internal Department of Defense review.<\/p>\n<div>\n<p>From the Army\u2019s Future Combat Systems (FCS) that focused on fighting the last war to its RAH-66 Comanche stealth helicopters that never quite got off the ground, between 1997 and October 2016, the Pentagon invested $58 billion on weapons technology it never received. That doesn\u2019t include the boondoggle that is the <a href=\"https:\/\/www.rt.com\/search?q=f35&amp;type=\">F-35 jet<\/a>, which was <a href=\"https:\/\/www.rt.com\/usa\/354388-f-declared-ready-combat\/\">finally declared<\/a><em>\u201cready for combat\u201d<\/em> at the beginning of August.<\/p>\n<p>The FCS ($20 billion) and the Comanche ($9.8 billion) are just two of 23 major weapons programs that were canceled before they were finished, and together the two Army projects made up more than 50 percent of the <em>\u201csunk costs\u201d<\/em> outlined in the Pentagon\u2019s annual internal acquisitions performance review. The <a href=\"http:\/\/www.acq.osd.mil\/fo\/docs\/Performance-of-Defense-Acquisition-System-2016.pdf\">224-page report<\/a> by Undersecretary of Defense for Acquisition, Technology and Logistics Frank Kendall was published earlier this week.<\/p>\n<div class=\"arcticle__read-more read-more\">\n<p>Read more<\/p>\n<p>    <a class=\"read-more__link\" href=\"http:\/\/www.rt.com\/usa\/352879-five-pentagon-wasteful-projects\/\" target=\"_blank\"><br \/>\n                    <img decoding=\"async\" class=\"read-more__cover\" src=\"https:\/\/img.rt.com\/files\/2016.07\/thumbnail\/57933b95c461885a458b458f.jpg\" alt=\"U.S. Air Force F-35A \u00a9 Daniel Hughes\"\/><br \/>\n    <\/a>\n<\/div>\n<p>The report noted how much money was spent on each canceled program, how far along in the process they were before they were killed, and if any of the technology was rolled up into new programs. For example, although the FCS was canceled, parts of it \u2012 including many of the manned ground vehicles and the Intelligent Munitions System \u2012 were swept up into a current program called the Army Brigade Combat Team Modernization Program.<\/p>\n<p>Most of the programs were killed before they blew through their budgets, but eight of them spent all the money allotted to them before the Pentagon canceled them, the report found.<\/p>\n<p>The Government Accountability Office, a Congressional watchdog, conducted an audit of Pentagon spending in 2011 and found $70 billion in waste, the New York Times <a href=\"http:\/\/www.nytimes.com\/2011\/03\/30\/business\/30military.html\">reported at the time<\/a>. Much of the overspending happened because the DOD started building weapons systems \u00a0before the designs were fully tested, the auditors said.<\/p>\n<p>With acquisitions overruns long being a thorn in the side of the Pentagon\u2019s budget, in March the <a href=\"https:\/\/www.rt.com\/usa\/336177-usaf-watson-computer-procurement\/\">Air Force enlisted IBM\u2019s <em>Jeopardy!<\/em>-winning cognitive computer<\/a>, Watson. Two contractors are currently working to create programs that would enable Watson to navigate the 1,897-page Federal Acquisition Regulation, helping potential government vendors actually bid for military contracts. The project is expected to become operational by 2018.<\/p>\n<p><center><iframe loading=\"lazy\" width=\"854\" height=\"480\" src=\"https:\/\/www.youtube.com\/embed\/GzWGtihTlAM\" frameborder=\"0\" allowfullscreen=\"\"><\/iframe><\/center><\/p>\n<p>Another way the Pentagon has sought to cut down wasted spending is through the latest update to its acquisitions program, called \u2018Better Buying Power 3.0\u2019, which was <a href=\"https:\/\/www.rt.com\/usa\/248425-pentagon-better-buying-power-program\/\">announced in April 2015<\/a>. The program was designed to have <em>\u201ca stronger emphasis on innovation, technical excellence, and the quality of our products,\u201d<\/em> Kendall wrote in a memo ordering the program&#8217;s implementation. It calls on the military-industrial complex to make projects more affordable in terms of funding, schedule and manpower throughout the entire lifespan of their products. It will also reward contractors for successful expense management, and ask them to eliminate unproductive processes and unnecessary bureaucracy.<\/p>\n<p>Of course, holding contractors accountable for their failures when it comes to major cost overruns or weapons systems that don\u2019t work is easier said than done. And it doesn\u2019t help when someone at the Pentagon thinks it\u2019s a good idea to spend money on <a href=\"https:\/\/www.rt.com\/usa\/244409-mccain-blasts-pentagon-elephants\/\">bomb-sniffing elephants<\/a>.<\/p>\n<\/div>\n<p>Via <a href=\"https:\/\/www.rt.com\/usa\/364230-pentagon-failed-acquisitions-costs\/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=RSS\">RT<\/a>. This piece was reprinted by <a href=\"http:\/\/rinf.com\">RINF Alternative News<\/a> with permission or license.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Pentagon loves to throw good money after bad \u2012 to the tune of nearly $60 billion on failed big-ticket weapons systems over the last two decades, according to a new internal Department of Defense review. From the Army\u2019s Future Combat Systems (FCS) that focused on fighting the last war to its RAH-66 Comanche stealth [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":275775,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[519],"tags":[],"class_list":{"0":"post-275774","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-newswire"},"_links":{"self":[{"href":"http:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/posts\/275774","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/comments?post=275774"}],"version-history":[{"count":0,"href":"http:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/posts\/275774\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/media\/275775"}],"wp:attachment":[{"href":"http:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/media?parent=275774"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/categories?post=275774"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/rinf.com\/alt-news\/wp-json\/wp\/v2\/tags?post=275774"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}